root/trunk/matml/transport/problems/Bottom_filled_mold.meta

Revision 293, 0.6 kB (checked in by powell, 13 months ago)

New problem: Bottom filled mold, by Matt Krane

Line 
1Title: Bottom filled mold
2Author: Matthew John M. Krane
3Date: October 12, 2007
4Copyright: 2007 Matthew John M. Krane
5Description: Calculation of mold filling times, with and without a constant height of metal in a riser.  Problem uses modified Bernoulli equation for the mechanical energy balance and the students are asked to determine which resistances are significant.
6Problem source format: Microsoft Word
7Problem source file: Bottom_filled_mold.doc
8Problem printable format: PDF
9Problem printable file: Bottom_filled_mold.pdf
10Difficulty level: Junior
11Solution time: 2 hours
12Keywords: Reynolds number, Bernoulli equation, Viscous flow, Metal
Note: See TracBrowser for help on using the browser.